• Phone

    0086-020-26228115

  • Address

    No. 35, Steel Market, Xintang Town, Zengcheng District, Guangzhou, Guangdong, China (Mainland)

  • E-mail

    k@waimaotong.com

LatestProducts

                            Construction Galvanized Metal Q235 steel scaffold / scaffolding plank with hooks made in China  meta

                            Construction Galvanized Metal Q235 steel scaffold / scaffolding plank with hooks made in China  meta

                            Construction Galvanized Metal Q235 steel scaffold / scaffolding plank with hooks made in China  meta

                            Construction Galvanized Metal Q235 steel scaffold / scaffolding plank with hooks made in China  meta

                            Construction Galvanized Metal Q235 steel scaffold / scaffolding plank with hooks made in China  meta

Construction Galvanized Metal Q235 steel scaffold / scaffolding plank with hooks made in China meta

Construction Galvanized Metal Q235 steel scaffold / scaffolding plank with hooks made in China meta,JET,Construction & Real Estate,Ladders & Scaffoldings
INQUIRY PRECISE INQUIRY
Description

Overview
Quick Details
Type:
Scaffolding plank, scaffolding accessories
Place of Origin:
China
Brand Name:
JET
Model Number:
Scaffolding plank
Material:
Q235 Q345
Surface:
Galvanized
Standard:
BS1139/EN74
Color:
Silver
product name:
scaffoding planks
Application:
Supporting Scaffolding System
Advantage:
Durable
MOQ:
1set
Packing:
Bundle
Supply Ability
Supply Ability:
2000 Ton/Tons per Month
Packaging & Delivery
Packaging Details
export standard packing
Port
Tianjin port
Picture Example:
package-img
package-img
Lead Time :
Quantity(Pieces) 1 - 100000 >100000
Est. Time(days) 30 To be negotiated
Video Description

scaffolding  steel plank for frame scaffolding and ringlock system

Applications of scaffolding planks  in construction:
1.Scaffolding plank is the main parts of scaffolding system which is 
convenient for workers to walk on high building. 
2.Stamping holes are on the scaffolding plank to resist skidding for workers.
3.The galvanized surface makes scaffolding plank more stronger in the rainy days and moist 
environment. 
4. Various size of scaffolding plank could be customed. 

Advantage of scaffolding planks used for construction:
1.durable & stable  
2.good bearing capacity
3.low cost, high quality
4.Excellent security function
5.easy to assemble & dismantle
6.long durability, the working life can up to 5-8 years
7.Corrode-resistant, Slip prevention, Anti-fire, Anti-sand, less weight 

 

Steel Plank Specification

NameSteel Plank/Deck/Decking/Walk Board
Place of OriginTianjin, China (Mainland)
MaterialQ235
Length(mm)10001500200015003000;4000
Width(mm)210240250225300;420;480;500
Height(mm)45455038 
Thickness(mm)1.0mm/1.2mm/1.5mm/1.8mm/2.5mm
Sizemore customized sizes are available
Shape of RibGeneral Rib; V Stiffener; Square 
Surface TreatmentPre-Galvanized
CertificationSGS
Techniqueautomatic productive assembly line
Packagepacked in bulk or in bundle or as customers' request

Construction Galvanized Metal Q235 steel scaffold / scaffolding plank with hooks made in China  metal planks scaffoldingConstruction Galvanized Metal Q235 steel scaffold / scaffolding plank with hooks made in China  metal planks scaffoldingConstruction Galvanized Metal Q235 steel scaffold / scaffolding plank with hooks made in China  metal planks scaffolding

Company Information

 Construction Galvanized Metal Q235 steel scaffold / scaffolding plank with hooks made in China  metal planks scaffoldingConstruction Galvanized Metal Q235 steel scaffold / scaffolding plank with hooks made in China  metal planks scaffoldingConstruction Galvanized Metal Q235 steel scaffold / scaffolding plank with hooks made in China  metal planks scaffolding

PACKING AND SHIPPING
Construction Galvanized Metal Q235 steel scaffold / scaffolding plank with hooks made in China  metal planks scaffolding

FAQ

 

1. Q: What's your MOQ(minimum order quantity)?

    A: One full container.

2. Q: What's your packing methods?

    A: Packed into bundle, and rest in bulk.

3. Q: What's your payment terms?

 .A: T/T 30% in advance & T/T 70% upon sending the copy of Bill of Lading, L/ C  100%, or negotiate according to the order status

4. Q: What's your delivery time?

    A: 10-20 days after received the advance payment or L/C.

5. Q: Are you manufacturer or trader?

    A: We are the munafacturer of SCAFFOLDINGS MATERIALS for decade years. Our group company has 8 subsidiaries and 4 factories, coveraged every scaffolding systems.

6. Q: Where's your factory?

    A: Our factory is in Tianjin city (near Beijing) and Jiayu city, Hubei Province, afforded enough production ability and earlier delivery time.

7. Q: Can we visit your factory?

    A: Warmly welcome. Once we have your schedule, we will arrange the professional sales team to follow up your case.

8. Q: Can you supply other scaffolding materials?

    A: Yes. All related scaffolding materials.

        (1) scaffolding system (cup-lock system, ring lock system, frame, pipe&coupler system)

        (2) scaffolding pipes (1.5'-2.0')x(0.3-12m), hop dipped galvanized/ black. BS1139, STK500

        (3) steel pipes (ERW BS1387, SSAW PIPE, Sqaure/ Rectangular tube GB/T6728)

        (4) steel coupler (preesed / drop forged coupler)

        (5) steel plank with hooks or without hooks

        (6) steel stair case

        (7) screw adjustable base jack

        (8) Adjustable props