scaffolding steel plank for frame scaffolding and ringlock system
Applications of scaffolding planks in construction: |
1.Scaffolding plank is the main parts of scaffolding system which is |
convenient for workers to walk on high building. |
2.Stamping holes are on the scaffolding plank to resist skidding for workers. |
3.The galvanized surface makes scaffolding plank more stronger in the rainy days and moist |
environment. |
4. Various size of scaffolding plank could be customed.
|
Advantage of scaffolding planks used for construction: |
1.durable & stable |
2.good bearing capacity |
3.low cost, high quality |
4.Excellent security function |
5.easy to assemble & dismantle |
6.long durability, the working life can up to 5-8 years |
7.Corrode-resistant, Slip prevention, Anti-fire, Anti-sand, less weight |
Steel Plank Specification
Name | Steel Plank/Deck/Decking/Walk Board |
Place of Origin | Tianjin, China (Mainland) |
Material | Q235 |
Length(mm) | 1000 | 1500 | 2000 | 1500 | 3000;4000 |
Width(mm) | 210 | 240 | 250 | 225 | 300;420;480;500 |
Height(mm) | 45 | 45 | 50 | 38 | |
Thickness(mm) | 1.0mm/1.2mm/1.5mm/1.8mm/2.5mm |
Size | more customized sizes are available |
Shape of Rib | General Rib; V Stiffener; Square |
Surface Treatment | Pre-Galvanized |
Certification | SGS |
Technique | automatic productive assembly line |
Package | packed in bulk or in bundle or as customers' request |
PACKING AND SHIPPING
1. Q: What's your MOQ(minimum order quantity)?
A: One full container.
2. Q: What's your packing methods?
A: Packed into bundle, and rest in bulk.
3. Q: What's your payment terms?
.A: T/T 30% in advance & T/T 70% upon sending the copy of Bill of Lading, L/ C 100%, or negotiate according to the order status
4. Q: What's your delivery time?
A: 10-20 days after received the advance payment or L/C.
5. Q: Are you manufacturer or trader?
A: We are the munafacturer of SCAFFOLDINGS MATERIALS for decade years. Our group company has 8 subsidiaries and 4 factories, coveraged every scaffolding systems.
6. Q: Where's your factory?
A: Our factory is in Tianjin city (near Beijing) and Jiayu city, Hubei Province, afforded enough production ability and earlier delivery time.
7. Q: Can we visit your factory?
A: Warmly welcome. Once we have your schedule, we will arrange the professional sales team to follow up your case.
8. Q: Can you supply other scaffolding materials?
A: Yes. All related scaffolding materials.
(1) scaffolding system (cup-lock system, ring lock system, frame, pipe&coupler system)
(2) scaffolding pipes (1.5'-2.0')x(0.3-12m), hop dipped galvanized/ black. BS1139, STK500
(3) steel pipes (ERW BS1387, SSAW PIPE, Sqaure/ Rectangular tube GB/T6728)
(4) steel coupler (preesed / drop forged coupler)
(5) steel plank with hooks or without hooks
(6) steel stair case
(7) screw adjustable base jack
(8) Adjustable props