• Phone

    0086-020-26228115

  • Address

    No. 35, Steel Market, Xintang Town, Zengcheng District, Guangzhou, Guangdong, China (Mainland)

  • E-mail

    k@waimaotong.com

LatestProducts

                            China Manufacturer More Than 6 Years Top Cup For Cuplock System Scaffolding Cuplock Falsework

                            China Manufacturer More Than 6 Years Top Cup For Cuplock System Scaffolding Cuplock Falsework

                            China Manufacturer More Than 6 Years Top Cup For Cuplock System Scaffolding Cuplock Falsework

                            China Manufacturer More Than 6 Years Top Cup For Cuplock System Scaffolding Cuplock Falsework

                            China Manufacturer More Than 6 Years Top Cup For Cuplock System Scaffolding Cuplock Falsework

China Manufacturer More Than 6 Years Top Cup For Cuplock System Scaffolding Cuplock Falsework

China Manufacturer More Than 6 Years Top Cup For Cuplock System Scaffolding Cuplock Falsework,JET,Construction & Real Estate,Ladders & Scaffoldings
INQUIRY PRECISE INQUIRY
Description

Overview
Quick Details
Type:
Cuplock
Place of Origin:
Guangdong, China
Brand Name:
JET
Model Number:
cuplock scaffolding
Material:
Q235
Surface treatment:
Painted
Advantage:
Bearing Capacity
Certificate:
SGS/EN12810
Thickness:
3.0-3.5 mm
Diameter:
48.3-48.6mm
Color:
As customers requirment
Application:
Building construction
Item:
Cuplock Parts
Standard:
British standard scaffolding
Supply Ability
Supply Ability:
10000 Ton/Tons per Day cuplock scaffold
Packaging & Delivery
Packaging Details
In bundles suitable for sea transportation.
Factory Direct Sell Cuplock Scaffolding Load Capacity Patent Scaffold Hot Dipped Galvanized Modular Scaffolding
Port
Tianjin port

China Manufacturer More Than 6 Years Top Cup For Cuplock System Scaffolding Cuplock Falsework

Product Description

China Manufacturer More Than 6 Years Top Cup For Cuplock System Scaffolding Cuplock Falsework

 

Size

Standard

 

length(M)weight(KG)
self finishpaintedhot galv.
L=0.502.422.52.57
L=1.004.844.985.13
L=1.306.546.746.93
L=1.507.257.477.69
L=1.808.969.229.49
L=2.009.679.9610.25
L=2.3011.3711.7112.05
L=2.5012.0812.4412.81
L=3.0014.514.9315.37

  

Ledger

 

length(M)weight(KG)
self finishpaintedhot galv.
L=0.602.382.452.52
L=0.903.443.553.65
L=1.003.83.914.03
L=1.204.514.654.78
L=1.304.875.015.16
L=1.505.585.755.91
L=1.806.656.857.05
L=2.007.367.587.8
L=2.509.149.419.69

 

Intermediate transom

 

length(M)weight(KG)
self finishpaintedhot galv.
L=0.602.382.452.52
L=0.903.443.553.65
L=1.003.83.914.03
L=1.204.514.654.78
L=1.304.875.015.16
L=1.505.585.755.91
L=1.806.656.857.05
L=2.007.367.587.8
L=2.509.149.419.69

 

NameLengthWeight (Kg)
Self FinishPaintedHot Dip Galv.
Diagonal BraceL=0.60Mt3.593.73.8
Diagonal BraceL= 1.3Mt5.225.375.53
Diagonal BraceL= 1.8Mt7.487.717.93
Spigot ConnectorL=0.25Mt0.690.710.73

 

China Manufacturer More Than 6 Years Top Cup For Cuplock System Scaffolding Cuplock Falsework

 

 China Manufacturer More Than 6 Years Top Cup For Cuplock System Scaffolding Cuplock Falsework

 

China Manufacturer More Than 6 Years Top Cup For Cuplock System Scaffolding Cuplock Falsework 

China Manufacturer More Than 6 Years Top Cup For Cuplock System Scaffolding Cuplock Falsework 

Our Advantage

Our Advantage

  • High Standard Process: Q235 ERW, hot-dip galvanized surface enhancing her corrosion resistance; 15 years lifespan.

 

  • Multi-functional usage: Adapting to all kinds of construction requirements, especially suitable for the erection of scaffolding and heavy propping.

 

  • Quick erection, less time and effort: Maximum standard weight reaches 17.07kg, the erection and disassembly rate 3-5 times faster than the conventional scaffolding.

 

  • High capacity load: stable and reliable structure with outstanding performance; the joint connector of cuplock can resist high bending, shearing and torsion, with load capacity 15% more than traditional tubular &fitting scaffolding system.

 

  • Safe and reliable: Three-dimension axial force express and structure of the scaffold can create high strength, good stability and perfect auto-lock and meet the requirement of safe construction.
Process&Shipping

China Manufacturer More Than 6 Years Top Cup For Cuplock System Scaffolding Cuplock FalseworkChina Manufacturer More Than 6 Years Top Cup For Cuplock System Scaffolding Cuplock Falsework 

Our Company

China Manufacturer More Than 6 Years Top Cup For Cuplock System Scaffolding Cuplock Falsework    JET has been established in Guangzhou,China.

   We offer services with material of high standard undisputed quality services with competitive rates.and we provide complete solutions of scaffolding and formwork system to the construction industry.

   Our varied products mix of Ringlock system,Frame system,Steel plank,Steel prop,Scaffolding pipe and all kind of couplers with high quality for commercial and industrial construction industries.

Many of our client base are returning customers whom we have known and worked for many years.

   Our products have enjoyed great popular at home and abroad,Such as America,Australia,Europe,the Middle east and so on.

Product Application

China Manufacturer More Than 6 Years Top Cup For Cuplock System Scaffolding Cuplock Falsework 

Hot Sales
Contact Us

 

FAQ

1. Question:   What's your MOQ(minimum order quantity)?

     Answer:       One full container.

 

2. Question:   What's your packing methods?

     Answer:       Packed into bundle, and rest in bulk.

 

3. Question:   What's your payment terms?

     Answer:       T/T 30% in advance & T/T 70% upon sending the copy of Bill of Lading, L/ C  100%, or negotiate according to the order status

 

4. Question:   What's your delivery time?

     Answer:      10-20 days after received the advance payment or L/C.

 

5. Question:   Are you manufacturer or trader?

     Answer:      We are the munafacturer of SCAFFOLDINGS MATERIALS for decade years. Our group company has 8 subsidiaries and 4 factories, coveraged every scaffolding systems.

 

6. Question:   Where's your factory?

      Answer:     Our factory is in Tianjin city (near Beijing) and Jiayu city, Hubei Province, afforded enough production ability and earlier delivery time.

 

7. Question:   Can we visit your factory?

     Answer:      Warmly welcome. Once we have your schedule, we will arrange the professional sales team to follow up your case.

 

8. Question:   Can you supply other scaffolding materials?

      Answer:     Yes. All related scaffolding materials.

        (1) scaffolding system (cup-lock system, ring lock system, frame, pipe&coupler system)

        (2) scaffolding pipes (1.5'-2.0')x(0.3-12m), hop dipped galvanized/ black. BS1139, STK500

        (3) steel pipes (ERW BS1387, SSAW PIPE, Sqaure/ Rectangular tube GB/T6728)

        (4) steel coupler (preesed / drop forged coupler)

        (5) steel plank with hooks or without hooks

        (6) steel stair case

 

China Manufacturer More Than 6 Years Top Cup For Cuplock System Scaffolding Cuplock Falsework