• Phone

    0086-020-26228115

  • Address

    No. 35, Steel Market, Xintang Town, Zengcheng District, Guangzhou, Guangdong, China (Mainland)

  • E-mail

    k@waimaotong.com

LatestProducts

                            Scaffolding high load capacity german type swivel coupler double coupler forged coupler  scaffolding

                            Scaffolding high load capacity german type swivel coupler double coupler forged coupler  scaffolding

                            Scaffolding high load capacity german type swivel coupler double coupler forged coupler  scaffolding

                            Scaffolding high load capacity german type swivel coupler double coupler forged coupler  scaffolding

                            Scaffolding high load capacity german type swivel coupler double coupler forged coupler  scaffolding

Scaffolding high load capacity german type swivel coupler double coupler forged coupler scaffolding

Scaffolding high load capacity german type swivel coupler double coupler forged coupler scaffolding,JET,Construction & Real Estate,Ladders & Scaffoldings
INQUIRY PRECISE INQUIRY
Description

Overview
Quick Details
Place of Origin:
Tianjin, China
Brand Name:
JET
Model Number:
scaffolding coupler
Scaffolding Part Type:
Scaffolding Couplers
Material:
Q235
Surface treatment:
Galvanized
Application:
Construction
color:
Yellow
Supply Ability
Supply Ability:
1000 Ton/Tons per Month
Packaging & Delivery
Packaging Details
carton packing
Port
Tianjin port
Picture Example:
package-img
package-img
Lead Time :
Quantity(Pieces) 1 - 500000 >500000
Est. Time(days) 20 To be negotiated
Video Description

 

various pressing construction scaffolding coupler angle coupler universal coupler
Scaffolding high load capacity german type swivel coupler double coupler forged coupler  scaffolding for sales coupler

Scaffolding high load capacity german type swivel coupler double coupler forged coupler  scaffolding for sales coupler

Item

Product Name

Standard
Type

Production Type

Thickness

Outer Diameter

U.W

Quantity
1 20'GP
With Wooden Pallet

1

Double Coupler

British

Pressed

4.75mm

48.3mm

0.82

25000

2

Swivel Coupler

British

Pressed

4.5*4.75mm

48.3mm

1.015

23500

3

Sleeve Coupler

British

Pressed

                  3.5mm

48.3mm

1

20736

4

Inner Joint Pin

British

Pressed

4.5mm

48.3mm

0.7

35000

5

Half Coupler

British

Pressed

4.75mm

48.3mm

0.5

49000

6

Board Retaining

British

Pressed

4.75mm

48.3mm

0.56

35000

7

Putlog Coupler

British

Pressed

4.75mm

48.3mm

0.57

35000

8

Double Coupler

British

Drop Forged

 

48.3mm

            1.0           

24000

9

Swivel Coupler

British

Drop Forged

 

48.3mm

1.12

21000

10

Sleeve Coupler

British

Drop Forged

3.5mm  

48.3mm

           1.0

21000

11

Inner Joint Pin

British

Drop Forged

 

48.3mm

1.05

24000

12

Board Retaining Coupler

British

Drop Forged

4.75mm

48.3mm

0.61

35000

13

Girder Coupler

British

Drop Forged

11.5mm

48.3mm

1.6

15000

14

Putlog Coupler

British

Drop Forged

4.75mm

48.3mm

0.61

35000

15

Double Coupler

Korea(90°)

Pressed

         3mm

48.6mm

0.67

36000

16

Swivel Coupler

Korea(90°)

Pressed

3mm

48.6mm

0.65

36000

17

Double Coupler

JIS(110°)

Pressed

3mm

48.6mm

0.67

36000

18

Swivel Coupler

JIS(110°)

Pressed

  3mm

48.6mm

0.65

36000

19

Inner Joint Pin

JIS

Pressed

3mm

48.6mm

0.67

36000

20

Double Coupler

German

Drop Forged

 

48.3mm

1.25

/

21

Swivel Coupler

German

Drop Forged

 

48.3mm

1.45

/


Scaffolding high load capacity german type swivel coupler double coupler forged coupler  scaffolding for sales coupler

Scaffolding high load capacity german type swivel coupler double coupler forged coupler  scaffolding for sales coupler

Scaffolding Couplers for 48.3mm Pipe Fittings JIS Pressed Swivel Coupler double  couple 

1.This kind of scaffold coupler is Pressed which can assure a good shape and precision size.                    2.Pressed scaffold coupler is made of Q235 steel which is a kind of high quality steel                                  3. The surface of this scaffold coupler has a long life span.                                                                              4. This Pressed scaffold coupler has stationary angle to fix the steel tube scaffolding at right angle
5. We can provide different size and types of drop forged scaffold coupler and pressed scaffold couplers.
 Function of the Scaffold Coupler

1.Fixed Scaffold Coupler is used to connect the steel pipe at 90 degree.
2.Swivel Scaffold Coupler is used to connect the steel pipe at 360 degree.
3.Sleeve Scaffold Coupler is used to connect the steel pipe a     
Scaffolding Couplers for 48.3mm Pipe Fittings JIS Pressed Swivel Coupler double  coupler 

Packing And ShipingScaffolding high load capacity german type swivel coupler double coupler forged coupler  scaffolding for sales coupler                                 

Our factory

Scaffolding high load capacity german type swivel coupler double coupler forged coupler  scaffolding for sales coupler
Scaffolding high load capacity german type swivel coupler double coupler forged coupler  scaffolding for sales coupler

Packing and shipping

Scaffolding high load capacity german type swivel coupler double coupler forged coupler  scaffolding for sales coupler

1. Q: What's your MOQ(minimum order quantity)?

    A: One full container.

2. Q: What's your packing methods?

    A: Packed into bundle, and rest in bulk.

3. Q: What's your payment terms?

 .A: T/T 30% in advance & T/T 70% upon sending the copy of Bill of Lading, L/ C  100%, or negotiate according to the order status

4. Q: What's your delivery time?

    A: 10-20 days after received the advance payment or L/C.

5. Q: Are you manufacturer or trader?

    A: We are the munafacturer of SCAFFOLDINGS MATERIALS for decade years. Our group company has 8 subsidiaries and 4 factories, coveraged every scaffolding systems.

6. Q: Where's your factory?

    A: Our factory is in Tianjin city (near Beijing) and Jiayu city, Hubei Province, afforded enough production ability and earlier delivery time.

7. Q: Can we visit your factory?

    A: Warmly welcome. Once we have your schedule, we will arrange the professional sales team to follow up your case.

8. Q: Can you supply other scaffolding materials?

    A: Yes. All related scaffolding materials.

        (1) scaffolding system (cup-lock system, ring lock system, frame, pipe&coupler system)

        (2) scaffolding pipes (1.5'-2.0')x(0.3-12m), hop dipped galvanized/ black. BS1139, STK500

        (3) steel pipes (ERW BS1387, SSAW PIPE, Sqaure/ Rectangular tube GB/T6728)

        (4) steel coupler (preesed / drop forged coupler)

        (5) steel plank with hooks or without hooks

        (6) steel stair case

        (7) screw adjustable base jack

        (8) Adjustable props